System Operator ZM
The System Operator is mandated in accordance with
the Electricity (Grid Code) Regulations, 2013 to coordinate operations of the Zambia
Interconnected Power System (IPS). The SO has been in operation since 2016 when it was first
Licenced by the Energy Regulations Board (ERB). In addition to operation of the IPS, the SO
also plays the role of Grid Code Secretariat which includes coordination of the
administrative activities related to the Grid Code.
Safety. Security. Reliability.
Ensuring Safe, Secure and Reliable operation of the Interconnected Power System (IPS).
The System Operator monitors and controls the Zambia Interconnected Power System in a coordinated manner to ensure safety, security, and reliability of the network.
Provision of network operational information to Grid participants.
System Generation
The installed capacity for Grid connected generation stands at around 3,655.80MW with a mix of hydro, solar, thermal and HFO generating plants
Power System OutlookNews and Events
Latest News and Events
Proposed Amended Grid Code Document
The Grid Code Technical Committee (GCTC) commissioned an expert team in February of 2018 to draft proposed Grid Code connection requirements for Variable Renewable Energy (VRE) generation. The team worked with technical assistance from the Cities and Infrastructure for Growth Zambia (CIGZambia) expe Read More