The System Operator is mandated in accordance with the Electricity (Grid Code) Regulations, 2013 to coordinate operations of the Zambia Interconnected Power System (IPS). The SO has been in operation since 2016 when it was first Licenced by the Energy Regulations Board (ERB). In addition to operation of the IPS, the SO also plays the role of Grid Code Secretariat which includes coordination of the administrative activities related to the Grid Code.
Safety. Security. Reliability.

Secure and Reliable operation

Ensuring Safe, Secure and Reliable operation of the Interconnected Power System (IPS).

Monitoring and Control

The System Operator monitors and controls the Zambia Interconnected Power System in a coordinated manner to ensure safety, security, and reliability of the network.

System Information

Provision of network operational information to Grid participants.

System Generation

The installed capacity for Grid connected generation stands at around 3,655.80MW with a mix of hydro, solar, thermal and HFO generating plants

Power System Outlook

News and Events

Latest News and Events

Home Page
News Item
Proposed Amended Grid Code Document

The Grid Code Technical Committee (GCTC) commissioned an expert team in February of 2018 to draft proposed Grid Code connection requirements for Variable Renewable Energy (VRE) generation. The team worked with technical assistance from the Cities and Infrastructure for Growth Zambia (CIGZambia) expe Read More

Home Page
Media Release
Turbo-Alternators Frequency Requirements Expert Team Report
The GCTC during their 2023 second quarter meeting reviewed and adopted the report of the expert team working on the determination of the frequency response requirements for turbo-alternators. The final report of the expert team has since been submitted to the ERB Board for approval. The proposed req Read More